Balcony Outlet
Installation Information
Installed prior to the concreting of the suspended slab being poured.
Installed horizontally to the 50mm PVC pipework.
50mm socketed outlet.
Tips & Tricks:
Prior to priming: Pre-fit the engagement of the ABS puddle flanges to the PVC pipework to check the correct finished height required for the graded substrate.
Always allow extra depth: Allow an extra 10mm ± just in case. It is always better to have a greater grade than not enough!
Installation:
Prime and solvent-glue the pipework and puddle flange.
Tips & Tricks:
Always level the top of the puddle flange after installation.
Always ensure the Base, Cap, and foam ring are firmly in place.
The balcony outlet has four secured tie-down points to fix it securely to the reinforcement steel/bars, preventing the outlet from moving, twisting, or floating during the vibration of the concrete pour.
Certified flow rates are available.