Balcony Outlet Installation Information
Installed prior to the concreting of the suspended slab being poured.
- Installed horizontally to the 50mm PVC pipework. 
- 50mm socketed outlet. 
Tips & Tricks:
- Prior to priming: Pre-fit the engagement of the ABS puddle flanges to the PVC pipework to check the correct finished height required for the graded substrate. 
- Always allow extra depth: Allow an extra 10mm ± just in case. It is always better to have a greater grade than not enough! 
Installation:
- Prime and solvent-glue the pipework and puddle flange. 
Tips & Tricks:
- Always level the top of the puddle flange after installation. 
- Always ensure the Base, Cap, and foam ring are firmly in place. 
The balcony outlet has four secured tie-down points to fix it securely to the reinforcement steel/bars, preventing the outlet from moving, twisting, or floating during the vibration of the concrete pour.
Certified flow rates are available.
 
                         
            